02 — Pipeline status · Live

Natural Harmony Select PDP

Phases A and B — design and content — are complete. Liquid integration (Phase D) is now largely done: the PDP is built and live for brand-owner review on the Serene draft theme (buy box, DreamCloud sticky bar, de-carouselled features, UAE Dirham symbol). The remaining poles to a huxberry.com launch are asset production (Phase C) and the production launch itself (Phase E). By default, completed phases are hidden so you see only what's actually pending.

Show 0 of 0 phases visible
Phase / specialist
Status
Phase 1 · Intake4 / 4 subtasks done
Done
theme-auditor
role-labeled brand-kit extraction
page-auditor
CRO + UX critique of the live PDP
pattern-cataloger
Liquid sections + protected-files inventory
inspiration-analyst
DreamCloud + 5 reference PDPs decoded
Phase 2 · Wireframe gate1 / 1 done
Done
layout-architect
top-to-bottom section spec + protected-files trace
Phase 3 · Hub-and-spoke specialists3 / 3 done · post-run patched
Done
copy-writer
slot manifest + claims discipline
seo-strategist
keywords + meta + FAQ seeds + JSON-LD plan
graphics-director
14 image slots specified · alt-text canon
Done
graphics.html · direction only — assets in Phase C
Phase 4 · Technical review1 / 1 done
Done
technical-reviewer
perf · WCAG · Liquid feasibility · schema authoring
Phase 5 · Prototype build1 / 1 done
Done
prototype-builder
single-file React + Tailwind PDP
Phase 5b · Post-run brand-owner patches5 / 5 done
Done
D1+D2 patches
sticky-ATC scroll gate + size-sheet at-rest
FAQ reconciliation
prototype FAQ ↔ JSON-LD mainEntity 1:1
Brand positioning rules
no manufacturing vocab · no supplier names · sleep-trial forbidden storewide
Marketing terminology
six-component NHC taxonomy locked · 269 hits patched
Airelle scope fix
100% NZ wool scoped to comfort layer · wiki + PDP patched
Done
commit caf5c66
Phase 6 · Fresh-eyes reviewerskipped — draft mode
Skipped
pdp-reviewer
protected-file + claims-discipline + taste check
Skipped
draft_mode — brand owner review on the prototype substituted
Phase B · Pre-asset polish2 / 2 subtasks done · 2026-05-13
Done
claims-trace refresh
design/claims.html ↔ locked taxonomy
Done
replaced 5 stale claims with 6 locked entries · CertiPUR-US → CertiPUR · 37 renderings refreshed · claims.html · audit trail in CLAIMS-REFRESH-NOTE.md
wiki Allowed-copy upgrade
all 3 NHC tier pages + collection page
Done
Essentia · Select · Reserve · huxberry-natural-harmony · stale 800-count / 2.1mm wire / blend retired
Phase C · Asset production0 / 2 subtasks complete · image production underway · 1–3 weeks lead
In progress
Image production · 14 slots
hero · lifestyle · diagram · materials · tier cards · cert badges
In progress
production path locked 2026-05-13: AI-render only (no studio shoots) · ChatGPT Images 2.0 for 5 spatial-logic slots (cross-section diagram, layer cards, 3× tier cards) + Nano Banana 2 for 9 fidelity/image-to-image slots (2× cert badges, main image, lifestyle, 2× supporting, material detail, sleep-bundle toggle, product-card rail)
photography brief sent to factory + showroom team 2026-05-13 (msg 19e20055e95a5172) · awaiting raw source photos into source-photography/ · then prompt sheet authoring begins
slot inventory in graphics.html
Video production · 0 slots
none specified in current wireframe
Not started
decision pending: add hero + materials walkthrough?
Phase D · Liquid integration3 / 4 subtasks · Serene draft-theme build live for review · 2026-07-14
In progress
Liquid scoping plan
12-section conversion map + metafields + risk register
Done
14 protected files verified · 8 new metafields specced · 9 risks catalogued · PHASE-D-LIQUID-SCOPING.md
Theme conversion
delivered via the Serene draft-theme PDP build
Done
built on the Serene theme via feat/serene-home (proven-PDP transplant + Serene restyle): functional buy box (size / firmness / bundle / BNPL / ATC) · DreamCloud two-profile sticky bar with a price-in-box size selector (mobile inline) · feature carousels de-carouselled into always-visible stacked rows + benefit grid, U1–U5 · Serene Google-reviews / FAQ / trust bands · official UAE Dirham symbol across every price · merged PR #5 · 3fa9ec6
Metafield wiring
hardcoded PDP copy → Shopify metafields (no-code edits)
Not started
FAQ questions already read from a metafield; remaining copy still hardcoded · read-with-fallback prep is the safe next step
Preview-theme deploy
draft theme · brand-owner staging review
Done
Serene draft theme 161313128685 (UNPUBLISHED) live for review · every file byte-verified on upload · QA'd at 1440 / 834 / 390 · huxberry.com/products/natural-harmony-essentia-mattress?preview_theme_id=161313128685
Phase E · Launch0 / 3 subtasks · 1–2 days
Not started
Cross-device QA
desktop · tablet · mobile · sticky-ATC behavior
Not started
Performance audit
Lighthouse + real-device test
Not started
Production deploy
promote preview → live theme on huxberry.com
Not started

Open — supplier-blocked

  • Done TENCEL™ traceability — RESOLVED 2026-05-25
    Ateja delivered the official Lenzing Certification No. 326020115353 (valid to June 2028) certifying FB-148-Knit-220cm as 22% LENZING™ Lyocell / 1% Cashmere / 77% Polyester at 400 gsm. Cert PDF archived at supplier-certs/. Surfaced from the mailbox 2026-06-10. Next: apply for the TENCEL™ Product License via Lenzing E-Branding portal using the cert number; upgrade the claims-manifest entry to verified.
  • Blocked CertiPUR vs CertiPUR-US
    Verify foam supplier holds European CertiPUR or only U.S. CertiPUR-US. Three resolution paths in CERTIFICATION-VERIFY-NOTE.md. 2026-06-10: the May-13 request to Yataş Foam was found never-sent; verification request sent to Ekrem Çalışkan (yatasfoam.com.tr, CC Ajeesh) covering the 25D sheet + 14D/20D peel grades.

Recommended next session

  1. Phase C asset production — image production for 14 slots underway. AI-render path locked 2026-05-13 (ChatGPT Images 2.0 + Nano Banana 2). Photography brief sent to factory + showroom team; awaiting raw source photos into source-photography/.
  2. Phase D execution — scoping is locked in PHASE-D-LIQUID-SCOPING.md. Implementation crew works from that doc: 12-section conversion on branch feature/nhc-pdp-stage-5b, 8 new metafields + seed script, sticky-ATC + bottom-sheet patches per risk register.
  3. Supplier-blocked verification — TENCEL™ RESOLVED 2026-05-25 (Lenzing cert 326020115353 archived in supplier-certs/). CertiPUR vs CertiPUR-US still open: request sent to Yataş Foam 2026-06-10 (the May-13 draft was never actually sent); chase if no reply by 2026-06-24.
  4. Decide video — add hero + materials-walkthrough video slots to wireframe? DreamCloud + Saatva use both. Decision-only; would extend Phase C scope.

Phase B closed 2026-05-13 (claims.html locked-taxonomy refresh + 4 NHC wiki pages synced — see CLAIMS-REFRESH-NOTE.md). Phase D scoping locked 2026-05-13 (12-section conversion map + 8 metafields + 9-item risk register — see PHASE-D-LIQUID-SCOPING.md).

Recent activity

Date Change Commit
2026-07-14 Serene draft-theme PDP — DreamCloud two-profile sticky bar with a price-in-box size selector, feature carousels de-carouselled into always-visible stacked rows (U1–U5), and the official UAE Dirham symbol across every NH price. Merged to main (PR #5). 3fa9ec6
2026-06-10 TENCEL™ traceability RESOLVED — Lenzing Certification 326020115353 (received from Ateja 2026-05-25, surfaced from mailbox today) archived to supplier-certs/; Ateja acknowledged. CertiPUR verification request sent to Yataş Foam (May-13 draft found never-sent). Homepage re-engineering run 2026-06-10-huxberry-homepage kicked off in parallel. latest
2026-05-13 Phase D scoping locked — 12-section conversion map + 8 metafields + 9-item risk register (PHASE-D-LIQUID-SCOPING.md) latest
2026-05-13 Phase B closed — claims.html locked-taxonomy refresh + 4 NHC wiki Allowed-copy pages synced (CLAIMS-REFRESH-NOTE.md) latest
2026-05-13 Phase C asset production kicked off — AI-render path locked, photography brief out to factory + showroom latest
2026-05-13 Pipeline kanban — Huxberry brand styling, filterable Status column, phase rollup latest
2026-05-13 Airelle scope fix + 100% NZ wool descriptor pairing caf5c66
2026-05-12 Stage 5b marketing terminology lock-in · 269 hits patched 4cd8b49
2026-05-12 D3 commitment-section rewrite + marketing terminology + CertiPUR rename fc79998
2026-05-12 Stage 5b post-run sticky-ATC + size-sheet patch 6efdb95
2026-05-11 Stage 5b: corrective re-run of Stage 5 (APPROVED) fb06485
Bookmark this URL. The page is regenerated each working session — same URL, fresh state at the top. https://shopify-runs.huxapps.com/2026-05-11-stage-5b-natural-harmony-pdp/pipeline.html