02 — Pipeline status · Live

Natural Harmony Select PDP

Phases A and B — design and content — are complete and live on the review URL. Asset production (Phase C) and Liquid integration (Phase D) are the long poles to a huxberry.com launch. By default, completed phases are hidden so you see only what's actually pending.

Show 0 of 0 phases visible
Phase / specialist
Status
Phase 1 · Intake4 / 4 subtasks done
Done
theme-auditor
role-labeled brand-kit extraction
page-auditor
CRO + UX critique of the live PDP
pattern-cataloger
Liquid sections + protected-files inventory
inspiration-analyst
DreamCloud + 5 reference PDPs decoded
Phase 2 · Wireframe gate1 / 1 done
Done
layout-architect
top-to-bottom section spec + protected-files trace
Phase 3 · Hub-and-spoke specialists3 / 3 done · post-run patched
Done
copy-writer
slot manifest + claims discipline
seo-strategist
keywords + meta + FAQ seeds + JSON-LD plan
graphics-director
14 image slots specified · alt-text canon
Done
graphics.html · direction only — assets in Phase C
Phase 4 · Technical review1 / 1 done
Done
technical-reviewer
perf · WCAG · Liquid feasibility · schema authoring
Phase 5 · Prototype build1 / 1 done
Done
prototype-builder
single-file React + Tailwind PDP
Phase 5b · Post-run brand-owner patches5 / 5 done
Done
D1+D2 patches
sticky-ATC scroll gate + size-sheet at-rest
FAQ reconciliation
prototype FAQ ↔ JSON-LD mainEntity 1:1
Brand positioning rules
no manufacturing vocab · no supplier names · sleep-trial forbidden storewide
Marketing terminology
six-component NHC taxonomy locked · 269 hits patched
Airelle scope fix
100% NZ wool scoped to comfort layer · wiki + PDP patched
Done
commit caf5c66
Phase 6 · Fresh-eyes reviewerskipped — draft mode
Skipped
pdp-reviewer
protected-file + claims-discipline + taste check
Skipped
draft_mode — brand owner review on the prototype substituted
Phase B · Pre-asset polish2 / 2 subtasks done · 2026-05-13
Done
claims-trace refresh
design/claims.html ↔ locked taxonomy
Done
replaced 5 stale claims with 6 locked entries · CertiPUR-US → CertiPUR · 37 renderings refreshed · claims.html · audit trail in CLAIMS-REFRESH-NOTE.md
wiki Allowed-copy upgrade
all 3 NHC tier pages + collection page
Done
Essentia · Select · Reserve · huxberry-natural-harmony · stale 800-count / 2.1mm wire / blend retired
Phase C · Asset production0 / 2 subtasks complete · image production underway · 1–3 weeks lead
In progress
Image production · 14 slots
hero · lifestyle · diagram · materials · tier cards · cert badges
In progress
production path locked 2026-05-13: AI-render only (no studio shoots) · ChatGPT Images 2.0 for 5 spatial-logic slots (cross-section diagram, layer cards, 3× tier cards) + Nano Banana 2 for 9 fidelity/image-to-image slots (2× cert badges, main image, lifestyle, 2× supporting, material detail, sleep-bundle toggle, product-card rail)
photography brief sent to factory + showroom team 2026-05-13 (msg 19e20055e95a5172) · awaiting raw source photos into source-photography/ · then prompt sheet authoring begins
slot inventory in graphics.html
Video production · 0 slots
none specified in current wireframe
Not started
decision pending: add hero + materials walkthrough?
Phase D · Liquid integration1 / 4 subtasks · scoping done 2026-05-13
Not started
Liquid scoping plan
12-section conversion map + metafields + risk register
Done
14 protected files verified · 8 new metafields specced · 9 risks catalogued · PHASE-D-LIQUID-SCOPING.md
Theme conversion
React/Tailwind → Liquid sections + snippets
Not started
EXTEND-only · 12 sections · branch feature/nhc-pdp-stage-5b
Metafield wiring
taxonomy strings → Shopify metafields
Not started
8 new huxberry.*_json fields + seed script · enables no-code edits
Preview-theme deploy
huxberry.com preview · brand-owner staging review
Not started
depends on theme conversion · preview theme ID needs confirmation
Phase E · Launch0 / 3 subtasks · 1–2 days
Not started
Cross-device QA
desktop · tablet · mobile · sticky-ATC behavior
Not started
Performance audit
Lighthouse + real-device test
Not started
Production deploy
promote preview → live theme on huxberry.com
Not started

Open — supplier-blocked

  • Blocked TENCEL™ traceability
    Verify Velura cover's TENCEL is Lenzing-branded with per-batch FSC/PEFC traceability. Affects: cert-strip + product attribute claims.
  • Blocked CertiPUR vs CertiPUR-US
    Verify foam supplier holds European CertiPUR or only U.S. CertiPUR-US. Three resolution paths in CERTIFICATION-VERIFY-NOTE.md.

Recommended next session

  1. Phase C asset production — image production for 14 slots underway. AI-render path locked 2026-05-13 (ChatGPT Images 2.0 + Nano Banana 2). Photography brief sent to factory + showroom team; awaiting raw source photos into source-photography/.
  2. Phase D execution — scoping is locked in PHASE-D-LIQUID-SCOPING.md. Implementation crew works from that doc: 12-section conversion on branch feature/nhc-pdp-stage-5b, 8 new metafields + seed script, sticky-ATC + bottom-sheet patches per risk register.
  3. Supplier-blocked verification — TENCEL™ traceability + CertiPUR vs CertiPUR-US. Drafts sent to Ateja + Yatas 2026-05-13; awaiting response within two-week window.
  4. Decide video — add hero + materials-walkthrough video slots to wireframe? DreamCloud + Saatva use both. Decision-only; would extend Phase C scope.

Phase B closed 2026-05-13 (claims.html locked-taxonomy refresh + 4 NHC wiki pages synced — see CLAIMS-REFRESH-NOTE.md). Phase D scoping locked 2026-05-13 (12-section conversion map + 8 metafields + 9-item risk register — see PHASE-D-LIQUID-SCOPING.md).

Recent activity

Date Change Commit
2026-05-13 Phase D scoping locked — 12-section conversion map + 8 metafields + 9-item risk register (PHASE-D-LIQUID-SCOPING.md) latest
2026-05-13 Phase B closed — claims.html locked-taxonomy refresh + 4 NHC wiki Allowed-copy pages synced (CLAIMS-REFRESH-NOTE.md) latest
2026-05-13 Phase C asset production kicked off — AI-render path locked, photography brief out to factory + showroom latest
2026-05-13 Pipeline kanban — Huxberry brand styling, filterable Status column, phase rollup latest
2026-05-13 Airelle scope fix + 100% NZ wool descriptor pairing caf5c66
2026-05-12 Stage 5b marketing terminology lock-in · 269 hits patched 4cd8b49
2026-05-12 D3 commitment-section rewrite + marketing terminology + CertiPUR rename fc79998
2026-05-12 Stage 5b post-run sticky-ATC + size-sheet patch 6efdb95
2026-05-11 Stage 5b: corrective re-run of Stage 5 (APPROVED) fb06485
Bookmark this URL. The page is regenerated each working session — same URL, fresh state at the top. https://shopify-runs.huxapps.com/2026-05-11-stage-5b-natural-harmony-pdp/pipeline.html