02 — Pipeline status · Live
Natural Harmony Select PDP
Phases A and B — design and content — are complete. Liquid integration (Phase D) is now largely done: the PDP is built and live for brand-owner review on the Serene draft theme (buy box, DreamCloud sticky bar, de-carouselled features, UAE Dirham symbol). The remaining poles to a huxberry.com launch are asset production (Phase C) and the production launch itself (Phase E). By default, completed phases are hidden so you see only what's actually pending.
Phase / specialist
Status
▶Phase 1 · Intake
Done
theme-auditor
role-labeled brand-kit extraction
Done
page-auditor
CRO + UX critique of the live PDP
Done
pattern-cataloger
Liquid sections + protected-files inventory
Done
inspiration-analyst
DreamCloud + 5 reference PDPs decoded
Done
▶Phase 2 · Wireframe gate
Done
layout-architect
top-to-bottom section spec + protected-files trace
Done
▶Phase 3 · Hub-and-spoke specialists
Done
copy-writer
slot manifest + claims discipline
Done
seo-strategist
keywords + meta + FAQ seeds + JSON-LD plan
Done
graphics-director
14 image slots specified · alt-text canon
Done
▶Phase 4 · Technical review
Done
technical-reviewer
perf · WCAG · Liquid feasibility · schema authoring
Done
▶Phase 5 · Prototype build
Done
prototype-builder
single-file React + Tailwind PDP
Done
▶Phase 5b · Post-run brand-owner patches
Done
D1+D2 patches
sticky-ATC scroll gate + size-sheet at-rest
Done
FAQ reconciliation
prototype FAQ ↔ JSON-LD mainEntity 1:1
Done
Brand positioning rules
no manufacturing vocab · no supplier names · sleep-trial forbidden storewide
Done
Marketing terminology
six-component NHC taxonomy locked · 269 hits patched
Done
Airelle scope fix
100% NZ wool scoped to comfort layer · wiki + PDP patched
Done
▶Phase 6 · Fresh-eyes reviewer
Skipped
pdp-reviewer
protected-file + claims-discipline + taste check
Skipped
▶Phase B · Pre-asset polish
Done
claims-trace refresh
design/claims.html ↔ locked taxonomy
Done
wiki Allowed-copy upgrade
all 3 NHC tier pages + collection page
Done
▶Phase C · Asset production
In progress
Image production · 14 slots
hero · lifestyle · diagram · materials · tier cards · cert badges
In progress
Video production · 0 slots
none specified in current wireframe
Not started
▶Phase D · Liquid integration
In progress
Liquid scoping plan
12-section conversion map + metafields + risk register
Done
Theme conversion
delivered via the Serene draft-theme PDP build
Done
Metafield wiring
hardcoded PDP copy → Shopify metafields (no-code edits)
Not started
Preview-theme deploy
draft theme · brand-owner staging review
Done
▶Phase E · Launch
Not started
Cross-device QA
desktop · tablet · mobile · sticky-ATC behavior
Not started
Performance audit
Lighthouse + real-device test
Not started
Production deploy
promote preview → live theme on huxberry.com
Not started
Open — supplier-blocked
-
Done TENCEL™ traceability — RESOLVED 2026-05-25Ateja delivered the official Lenzing Certification No. 326020115353 (valid to June 2028) certifying FB-148-Knit-220cm as 22% LENZING™ Lyocell / 1% Cashmere / 77% Polyester at 400 gsm. Cert PDF archived at supplier-certs/. Surfaced from the mailbox 2026-06-10. Next: apply for the TENCEL™ Product License via Lenzing E-Branding portal using the cert number; upgrade the claims-manifest entry to verified.
-
Blocked CertiPUR vs CertiPUR-USVerify foam supplier holds European CertiPUR or only U.S. CertiPUR-US. Three resolution paths in CERTIFICATION-VERIFY-NOTE.md. 2026-06-10: the May-13 request to Yataş Foam was found never-sent; verification request sent to Ekrem Çalışkan (yatasfoam.com.tr, CC Ajeesh) covering the 25D sheet + 14D/20D peel grades.
Recommended next session
- Phase C asset production — image production for 14 slots underway. AI-render path locked 2026-05-13 (ChatGPT Images 2.0 + Nano Banana 2). Photography brief sent to factory + showroom team; awaiting raw source photos into
source-photography/. - Phase D execution — scoping is locked in PHASE-D-LIQUID-SCOPING.md. Implementation crew works from that doc: 12-section conversion on branch
feature/nhc-pdp-stage-5b, 8 new metafields + seed script, sticky-ATC + bottom-sheet patches per risk register. - Supplier-blocked verification — TENCEL™ RESOLVED 2026-05-25 (Lenzing cert 326020115353 archived in supplier-certs/). CertiPUR vs CertiPUR-US still open: request sent to Yataş Foam 2026-06-10 (the May-13 draft was never actually sent); chase if no reply by 2026-06-24.
- Decide video — add hero + materials-walkthrough video slots to wireframe? DreamCloud + Saatva use both. Decision-only; would extend Phase C scope.
Phase B closed 2026-05-13 (claims.html locked-taxonomy refresh + 4 NHC wiki pages synced — see CLAIMS-REFRESH-NOTE.md). Phase D scoping locked 2026-05-13 (12-section conversion map + 8 metafields + 9-item risk register — see PHASE-D-LIQUID-SCOPING.md).
Recent activity
| Date | Change | Commit |
|---|---|---|
| 2026-07-14 | Serene draft-theme PDP — DreamCloud two-profile sticky bar with a price-in-box size selector, feature carousels de-carouselled into always-visible stacked rows (U1–U5), and the official UAE Dirham symbol across every NH price. Merged to main (PR #5). | 3fa9ec6 |
| 2026-06-10 | TENCEL™ traceability RESOLVED — Lenzing Certification 326020115353 (received from Ateja 2026-05-25, surfaced from mailbox today) archived to supplier-certs/; Ateja acknowledged. CertiPUR verification request sent to Yataş Foam (May-13 draft found never-sent). Homepage re-engineering run 2026-06-10-huxberry-homepage kicked off in parallel. | latest |
| 2026-05-13 | Phase D scoping locked — 12-section conversion map + 8 metafields + 9-item risk register (PHASE-D-LIQUID-SCOPING.md) | latest |
| 2026-05-13 | Phase B closed — claims.html locked-taxonomy refresh + 4 NHC wiki Allowed-copy pages synced (CLAIMS-REFRESH-NOTE.md) | latest |
| 2026-05-13 | Phase C asset production kicked off — AI-render path locked, photography brief out to factory + showroom | latest |
| 2026-05-13 | Pipeline kanban — Huxberry brand styling, filterable Status column, phase rollup | latest |
| 2026-05-13 | Airelle scope fix + 100% NZ wool descriptor pairing | caf5c66 |
| 2026-05-12 | Stage 5b marketing terminology lock-in · 269 hits patched | 4cd8b49 |
| 2026-05-12 | D3 commitment-section rewrite + marketing terminology + CertiPUR rename | fc79998 |
| 2026-05-12 | Stage 5b post-run sticky-ATC + size-sheet patch | 6efdb95 |
| 2026-05-11 | Stage 5b: corrective re-run of Stage 5 (APPROVED) | fb06485 |
Bookmark this URL. The page is regenerated each working session — same URL, fresh state at the top.
https://shopify-runs.huxapps.com/2026-05-11-stage-5b-natural-harmony-pdp/pipeline.html